Stand Pipe Upgrade

Crest Drive stand Pipe Upgrade:

Crest Drive Fact Sheet 08/14/2019


Draft Renderings of Replacement Storage Tank:

Draft Renderings


LSRP Reports:

As part of the Crest Drive Standpipe replacement and Brentwood Water Sphere rehabilitation projects require soil sampling to determine the extent of any spread and the level of lead contaminant that is a result of leaching of paint from these structures. These are periodic sampling events that track if contaminant is spreading or changing intensity.

The following are the latest documents prepared by our LSRP (Licensed Site Remediation Professional).

Periodic Soil Sampling Memo 2021-03-31

Crest Periodic Soil Sampling Memo 2021-03-31

/DocumentCenter/View/5437/CrestDr_DraftLandscape_20210413





Page updated April 6, 2021.