As part of the Crest Drive Standpipe replacement and Brentwood Water Sphere rehabilitation projects require soil sampling to determine the extent of any spread and the level of lead contaminant that is a result of leaching of paint from these structures. These are periodic sampling events that track if contaminant is spreading or changing intensity.
The following are the latest documents prepared by our LSRP (Licensed Site Remediation Professional).